GUIZHOU TO GUANGXI DUAL LOOP ±500kV DIRECT CURRENT CONVERSION TRANSFORMER
Zoom GUIZHOU TO GUANGXI DUAL LOOP ±500kV DIRECT CURRENT CONVERSION TRANSFORMER

GENERAL CONTRACTOR FOR THE GUIZHOU TO GUANGXI DUAL LOOP ±500kV DIRECT CURRENT CONVERSION TRANSFORMER EQUIPMENT PROJECT

In 2004, TBEA served as general contractor for all ±500kV transformer and even wave reactor products required by Guizhou to Guangxi dual loop ±500kV direct current power transmission project conversion station, being the first dominant Chinese partner in a major state project in the engineering field. Currently, all products have achieved success after going online with operations in just one attempt, with product quality and performance parameters that have both reached advanced levels in the world.

On December 6, 2004, at the Great Hall of the People in Beijing, as the general contractor for the direct current conversion transformer equipment, TBEA signed the Guizhou to Guangxi dual loop ±500kV direct current power transmission project supplier contract. Chinese Premier Wen Jiabao and former chancellor Schroeder of Germany attended the signing ceremony.

Copyright 2005 TEBA.com.cn, All Rights Reserved Webmaster@TEBA.com.cn Serial No. Xin ICP05000261
Application Terms Privacy Protection